CRO Mission XXIII: “The Final Mission – A Bike Portage”. Hwy 377 to Hwy 45. March 27, 2021.

https://photos.app.goo.gl/ABVgmiDYdkaJQDwJ8

This was the final mission. The purpose of the mission was to connect the dry section of the Colorado between Hwy 377 and Hwy 45. In mission XXI, Pi and 1 dragged the canoe a considerable distance due to low water. We determined that

Leave a Reply